How much money can an average person make in a day?

Plumber: 280 yuan/day.

Crane driver: 500 yuan/day.

Construction site water ghost: 20,000 yuan/day.

Construction site water ghosts earn money desperately.

Usually the drill bit falls when piling, and someone must go down to fish it out.

If something happens after going into the water, the person may become part of the pile.

It should be noted that construction site water ghosts are usually father and son partners. The father looks at the equipment on the top to ensure the oxygen supply under the water, and the son goes into the water to fish out the drill bit.

Others watching from the top are not reliable. Only the father will not harm his son.

#5月市场关键事件 #BTC走势分析 #MegadropLista $ETH $SOL $BNB