According to TechFlow, the Shanghai Stock Exchange will decide today whether to expand the capacity of its equipment. The specific plan is still under discussion and requires further notification.

If it is decided to expand the capacity, a stress test will be conducted on October 6 and a system startup connectivity test will be carried out on October 7.

People familiar with the matter said that the connectivity test was carried out because the holiday period is long, and they wanted to test whether the address can be connected after the holiday.